Ministry of Ports, Shipping and Waterways Details Fast-Track Execution Framework for India’s Premier Greenfield Deep-Draft Port
NEW DELHI / PALGHAR — The Union Government has formally accelerated the execution roadmap for the ₹76,220 crore Vadhavan Greenfield Deep-Draft Port Project located in Maharashtra’s Palghar district.
Approved by the Union Cabinet, the mega-port project is engineered to become one of the largest deep-water transshipment hubs in the world.
Upon full completion, the port is projected to achieve a massive cargo handling capacity of 298 Million Metric Tonnes Per Annum (MMTPA), significantly expanding the subcontinent's container-handling capabilities and alleviating traffic pressure across existing western seaboard gateways.
Multimodal Integration via DFC and National Highways
A central focus of the accelerated roadmap is the seamless integration of Vadhavan Port with India’s broader multimodal transport corridors.
Dedicated Rail Linkages: A 22.22 km rail spur constructed by Western Railway connecting the port directly into the Western Dedicated Freight Corridor (WDFC), supporting double-stack container operations.
High-Capacity Road Connectivity: A 32.74 km dedicated highway link executed by the National Highways Authority of India (NHAI) tying directly into the Delhi-Mumbai National Highway (NH-8) and the Mumbai-Vadodara Expressway.
Ministry officials emphasized that these multimodal links will bridge interior manufacturing clusters in Northern and Western India directly to deep-water maritime routes, drastically lowering supply chain friction, reducing door-to-door transit times, and reinforcing India's long-term export ambitions under the Viksit Bharat 2047 vision.
← Frontpage